Skip to page content

Boston Housing Authority Payment Standards: Document Guide (2026)

6 min readBy VoucherMatch Editorial Team
Tall apartment facade with pale trim and dark window panels
The Eddy Apartments in East Boston, photographed in 2017. Photo: Beyond My Ken, CC BY-SA 4.0, via Wikimedia Commons (cropped).

Boston Housing Authority's adopted payment schedule is effective January 1, 2026 and organizes amounts by ZIP and bedroom size. Its current utility chart has a separate August 1, 2026 effective date. For a useful rent estimate, you need both documents, the full property address and the household's voucher information.

This document guide explains how to select the right entries and prepare the agency review. For a broader comparison and complete household-cost examples, read how much Section 8 pays in Boston. Use the Boston city guide for applications and the Boston apartment page for unit-by-unit planning.

First confirm that BHA will administer the tenancy

BHA is one administrator within a larger rental market. Cambridge, other local authorities, regional administering agencies and the state have distinct processes. A Boston-area address, a statewide application or a reference to Section 8 does not establish that BHA's chart applies.

Ask which agency will calculate assistance for the proposed address and whether any portability intake is needed. Keep the program name as well: a federal tenant-based voucher is different from assistance attached to a specific property or a state rental-assistance program. The documents below concern the BHA calculation, not a universal Massachusetts rent ceiling.

Read the payment chart by exact ZIP and bedroom size

The BHA payment-standard page links its 2026 all-bedroom chart. The document's revision date is October 1, 2025; the standards themselves are effective January 1, 2026.

Example ZIP and chart label1 bedroom2 bedrooms3 bedrooms
02119 — Roxbury$2,381$2,827$3,390
02134 — Allston$2,652$3,150$3,777
02135 — Brighton$2,757$3,270$3,924

Use the actual address ZIP. A neighborhood name can be a useful search label but is not a substitute for the chart's geographic entry. Ask BHA to confirm ambiguous addresses and the applicable bedroom size rather than borrowing the closest or highest row.

Under the ordinary tenant-based rule, the payment standard uses the lower of voucher bedroom size and actual unit size. A family with a two-bedroom voucher proposing a one-bedroom unit should not automatically calculate from the two-bedroom column. If there is an approved exception or accommodation, obtain the agency's confirmation. See the federal payment calculation rule.

The practical question is which adopted BHA entry applies. A general statement that a metro does or does not fall under a HUD ZIP-benchmark policy does not replace this agency-specific answer.

Apartment towers rising behind shorter brick buildings
The Towers at Longfellow Apartments in Boston. Photo: Kenneth C. Zirkel, CC BY-SA 4.0, via Wikimedia Commons (cropped).

Select utilities from the August 2026 chart

BHA's utility chart distinguishes building types, fuels, services and monthly charges. Its effective date is August 1, 2026, with a June 3 revision date. Do not assume the January payment-standard date also governs utilities.

Before adding entries, obtain these facts from management:

  • Building category, including whether the unit belongs on an apartment or single-family worksheet.
  • Fuel for heat, cooking and hot water.
  • Which services the tenant pays directly and which the owner includes in rent.
  • Who supplies the range and refrigerator.
  • Whether water, sewer or other separately listed items are tenant responsibilities.

For a two-bedroom apartment in the chart's two-to-three-unit, row-house or garden-apartment category, an example with gas heat, gas cooking, gas hot water and basic electricity totals $230: $61 heating, $6 cooking, $101 other electricity, $42 water heating, $10 electric charge and $10 gas charge. That example assumes the owner pays water and sewer and supplies the appliances. It is not an allowance for every Boston two-bedroom apartment.

Keep alternative fuel entries separate. Electric heat and gas heat should not both be added for the same service. Use the agency's confirmed worksheet rather than the tenant's last bill; the allowance is a standardized input, while actual bills remain part of household budgeting.

Use a review packet that staff can act on

Save the full address and unit number beside the voucher bedroom size, actual unit size, rent and utility arrangement. Include the owner contact, proposed availability and any outstanding portability step. Ask BHA for the applicable standard, total tenant payment, utility allowance and proposed household share.

For example, a $2,750 asking rent with a $230 allowance produces $2,980 gross rent. Against the 02119 two-bedroom standard of $2,827, that is $153 above the standard. The agency must then calculate the family's share and apply the initial-tenancy affordability rule, along with rent reasonableness and unit requirements. Comparing asking rent alone with $2,827 would miss the utility effect.

The Boston household-cost guide works through the resulting assistance and tenant payments at several rents. Keep that budgeting exercise separate from a written approval. Passing one arithmetic check does not settle inspection, rent comparability or contract completion.

Round brick apartment tower with curved balconies beside a bus stop
Walnut Park Apartments beside the Columbus Avenue bus platform in Boston, photographed in 2021. Photo: Byron A. Nash from USA, CC BY 2.0, via Wikimedia Commons (cropped).

If the voucher is coming from another agency

BHA's portability instructions explain what the issuing authority must send and how the family arranges the receiving appointment. The packet includes transfer and household documents; the family should also be prepared to provide current income and household information.

Ask the issuer to confirm transmission and BHA to confirm receipt through the official process. Track intake separately from apartment selection, rent review and inspection. Keep the voucher's remaining search time visible and request any needed extension before relying on it. An appointment is not an approved lease start date.

If moving out of BHA's administration, begin with the assigned housing contact and the proposed receiving agency. Do not carry a BHA ZIP amount into another agency's calculation without confirmation.

Applications and owner screening

BHA's program page currently says the tenant-based waiting list is closed. That does not mean every Massachusetts housing application is closed. The state application guidance distinguishes the EOHLC list from local-authority application routes. Public housing and state voucher programs also have their own applications.

Massachusetts fair-housing guidance identifies source of income, including a Section 8 voucher, as protected. Preserve written screening criteria and responses if an owner refuses based on the subsidy. The agency still needs to complete its own household and tenancy review; a housing protection and a rent approval answer different questions.

Frequently asked questions

Is BHA's table a rent cap for every Massachusetts town?

No. It is BHA's adopted schedule. Other administrators have their own documents and may use different geography or amounts.

Do I use the revision date or effective date?

Record both, but use the agency's effective-date instructions for the transaction. The payment chart and utility chart have different effective dates.

Can an owner increase rent to match a higher ZIP standard?

The published standard does not automatically approve a rent increase. Follow the agency's applicable notice, rent-review and tenancy procedures.

What if the owner changes which utilities are included?

Save the revised terms and request a new calculation. Rent and utility responsibility should match across the proposal, agency review and lease documents.

Sources for this article (8)
  1. BHA payment-standard page (bostonhousing.org)
  2. 2026 all-bedroom chart (bostonhousing.org)
  3. federal payment calculation rule (ecfr.gov)
  4. utility chart (bostonhousing.org)
  5. portability instructions (bostonhousing.org)
  6. program page (bostonhousing.org)
  7. state application guidance (mass.gov)
  8. fair-housing guidance (mass.gov)
Share:

Stay Updated on Housing

Get the latest on fair market rents, voucher programs, and finding housing.

No spam, ever. Unsubscribe anytime.

VoucherMatch Editorial Team

Every rule, date and dollar amount in this article is checked against the agency document it comes from, and the sources are listed above. How VoucherMatch articles are researched and corrected

Related Articles

Guides

Aurora Housing Authority Payment Standards FY2027: The HUD Numbers Behind the Table

Aurora Housing Authority's official FY2027 payment standard must sit between 90% and 110% of HUD's figures. Here are those figures for Kane County: $1,560 to $3,020 for a 2-bedroom by ZIP, what changed from FY2026, and how to read the table.

6 min read
Guides

DuPage Housing Authority Payment Standards FY2027: The HUD Numbers Behind the Table

DuPage Housing Authority's official FY2027 payment standard must sit between 90% and 110% of HUD's figures. Here are those figures for DuPage County: $1,380 to $2,730 for a 2-bedroom by ZIP, what changed from FY2026, and how to read the table.

5 min read
Guides

Lake County Housing Authority Payment Standards FY2027: The HUD Numbers Behind the Table

Lake County Housing Authority's official FY2027 payment standard must sit between 90% and 110% of HUD's figures. Here are those figures for Lake County: $1,440 to $3,020 for a 2-bedroom by ZIP, what changed from FY2026, and how to read the table.

6 min read
Guides

Broward County Housing Authority Payment Standards FY2027: The HUD Numbers Behind the Table

Broward County Housing Authority's official FY2027 payment standard must sit between 90% and 110% of HUD's figures. Here are those figures for Broward County: $1,780 to $3,480 for a 2-bedroom by ZIP, what changed from FY2026, and how to read the table.

6 min read
Guides

Housing Authority of Joliet Payment Standards FY2027: The HUD Numbers Behind the Table

Housing Authority of Joliet's official FY2027 payment standard must sit between 90% and 110% of HUD's figures. Here are those figures for Will County: $1,430 to $3,030 for a 2-bedroom by ZIP, what changed from FY2026, and how to read the table.

6 min read
Guides

Sacramento Housing and Redevelopment Agency (SHRA) Payment Standards FY2027: The HUD Numbers Behind the Table

SHRA's official FY2027 payment standard must sit between 90% and 110% of HUD's figures. Here are those figures for Sacramento County: $1,360 to $3,130 for a 2-bedroom by ZIP, what changed from FY2026, and how to read the table.

5 min read

Find Your Next Home

Explore voucher housing options and local rental guidance.